Changes in regional transport from 10.07.26 (9 PM) – 20.09.26

Skip to Content

Changes in regional transport from 10.07.26 (9 PM) – 20.09.26 (phase B)

Here you can find an overview of the changes in regional transport for the period from 10 July (from 9 PM) to 20 September 2026.

RB 17

Usual route

Ingolstadt Nord – Ingolstadt Hbf – Neustadt(Donau) – Regensburg – Plattling

Changes

RB 17 between Regensburg and Plattling will not run.Replacement bus services operate on lines RE 50 and RB 51. Further information about these lines is available below.

RB 51

Usual route Neumarkt (Oberpf.) – Regensburg – Straubing – Plattling 
ChangesRB 51 between Regensburg and Plattling will not run. There will be a replacement bus service.

Information about

the replacement service for Regensburg – Plattling  (with extension to Plattling during peak hours)                               

  • The bus route will be extended to Deggendorf.
  • Articulated buses
  • 1 bus per hour
  • 2 buses per hour during peak times
  • During peak hours, buses run through to Plattling.

 

RE 50

Usual routeNuremberg – Feucht - Neumarkt (Oberpf.) – Regensburg – Plattling
ChangesRE 50 between Regensburg and Passau will not run. There will be a replacement bus service.

Information about

replacement services for 

Regensburg – Passau             

  • Buses with on-board toilet
  • 1–2 buses per hour Regensburg – Plattling
  • 1–2 buses per hour Regensburg – Passau
  • Highway route between Regensburg and Straubing as well as between Plattling and Passau, therefore only seating is available on these sections

 

RB 32

Usual route Neufahrn (Niederb.) – Geiselhöring – Straubing – Bogen
ChangesRB 32 will not run between Geiselhöring and Bogen. There will be a replacement bus service.
Information about the replacement services                                 
  • Buses without on-board toilets
  • 1 bus per hour
  • School bus trips with articulated buses to the schools
  • 2 to 3 buses per hour during the Gäubodenvolksfest
  • Travel time Geiselhöring – Straubing: 25 min
  • Travel time Straubing – Bogen: 35 min
  • Travel time Regensburg – Bogen (school transport): 50 min
  • Travel time Straubing Ursulinen-Gymnasium – Bogen (school transport): 20 min

 

RE 3

Usual routeMunich Hbf – Landshut – Dingolfing – Plattling - Passau
ChangesThe RE 3 runs every two hours between Munich Central Station and Dingolfing from Monday to Friday. On Saturday and Sunday, the train runs every two hours between Munich Central Station and Plattling. In Dingolfing and Plattling, there are connections to the RE 3 as well as the replacement bus line RB 3.
Information about the replacement services forLandshut Hbf – Passau Hbf                                                                 

Between Landshut central station and Passau central station, replacement buses operate daily during service gaps, stopping in Dingolfing, Plattling, and Passau.

  • Buses with on-board toilets
  • 2 buses every 2 hours
  • Travel time: 1 hr 5 min
  • Connection to shortened RE 3 (train)
Information about replacement services forDingolfing/Plattling – Passau
  • Buses with on-board toilets
  • 2 to 3 buses every 2 hours
  • Connection to the shortened RE 3 (train)
  • Motorway route
  • Travel time: 55 min.

 

RB 3

Hint

Additional bus connection between Landshut and Plattling with stops along the way.

Information about replacement services forLandshut Hbf – Passau Hbf                                                     

  • Daily, in the RE 3 gaps replacement service with buses
  • Articulated buses
  • One bus every 2 hours
  • Travel time: 1 hour 35 minutes
  • Connection to shortened RE 3 (train)

Information about replacement services forDingolfing/Plattling – Passau 

  • Dingolfing (Mon–Fri), Plattling (Sat+Sun)
  • Articulated buses
  • 2 buses every 2 hours
  • Connection to shortened RE 3 (train)
  • With stops along the way at Osterhofen Industriestraße and Stadtplatz as well as Vilshofen Station
  • Travel time: 55 min.

RB 54

Usual routeKufstein – Rosenheim – Munich Hbf
Changes There are changes to the schedule. The reason for this is the diversion of rail freight traffic.
Information about replacement services
  • The frequency of RB 54 between Rosenheim and Munich Central Station will be reduced to 2 hours.
  • During the gaps in the schedule, i.e. offset by 2 hours from the train, replacement bus services will run between Grafing and Rosenheim.
  • During the hours when RE 54 is not running, RE 5 will make an additional stop in Grafing.
  • In Grafing, there is a connection to Munich Central Station.

 

Without replacement bus service

There will be changes in the schedule for the following lines. The reason for this is the diversion of rail freight traffic.

RB 33

Usual route 

Munich Hbf – Freising – Landshut

Changes in the schedule                           

  • Mon–Fri: 3 train pairs operate, cancellation of all other train pairs
  • Sat+Sun: complete cancellation
  • Operation of all stops in the Freising – Landshut section via additional stops on line RE22 (Munich Airport – Freising – Landshut – Regensburg)

RE 1

Usual routeMunich Hbf – Ingolstadt Hbf – Nuremberg
Changes in the schedule                        
  • Mon–Fri: Between Munich Central Station and Ingolstadt Central Station, services run every 2 hours.
  • The operating lines S 2 and RB 16 provide at least partially alternative connections.

 

RB 40

Usual routeMunich Hbf – Munich Ost – Mühldorf (Inn)
Changes in the schedule                  
  • RB 40 between Munich Hbf und Munich Ost will not run.
  • The S-Bahn trains running through the core route provide alternative connections.

 

RB 45

Usual route Mühldorf (Inn) – Garching – Freilassing - Salzburg
Changes in the schedule                 
  • RB 45 between Freilassing and Salzburg will not run.
  • S 3 (ÖBB) as well as line RE 5 provide alternative connections on this route.

 

RB 48

Usual route Munich Hbf – Grafing Bf – Wasserburg
Changes in the scheduleRB 48 only runs from Grafing Bahnhof. There is a connection to the RB 54 or the RE 5 (for details, see RB 54).

 

RB 13

Usual route

Augsburg Hbf – Friedberg – Ingolstadt Hbf

Changes in the schedule               

The 15-minute interval between Augsburg Central Station and Friedberg is discontinued on weekdays (replaced by a 30-minute interval).  

RB 87

Usual route

Donauwörth – Meitingen – Augsburg Hbf – Munich Hbf

Changes in the schedule                         

  • The peak hour services between Augsburg and Donauwörth are canceled.
  • Additionally, Monday to Friday, the trains that only run between Augsburg and Meitingen are canceled. The hourly connections between Augsburg and Donauwörth will continue to operate.

RE 5

Usual route Salzburg – Freilassing – Traunstein – Rosenheim – Munich
Changes in the schedule             
  • Between Traunstein and Munich, the extra trains are canceled during rush hour.
  • Every 2 hours, offset from the RB 54 service, the train also stops at Grafing station.