Änderungen: Zeitraum: 20.09.26 – 12.12.26

Skip to Content

Changes in regional transport from 20.09.26 (9 PM) – 12.12.26 (phase C)

Here you can find an overview of the changes in regional transport for the period from 20 September to 12 December 2026. 

RB 17

Usual routeIngolstadt Nord – Ingolstadt Hbf – Neustadt (Donau) – Regensburg – Plattling
ChangesRB 17 between Regensburg and Plattling will not run.Replacement bus services operate on lines RE 50 and RB 51. Further information about these lines is available below.

 

RB 51

Usual route Neumarkt (Oberpf.) – Regensburg – Straubing – Plattling
ChangesRB 51 between Regensburg and Plattling will not run. There will be a replacement bus service.

Information about the replacement service

for Regensburg – Straubing

(with extension to Plattling during peak hours)

  • Articulated buses
  • 1 bus per hour
  • 2 buses per hour during peak hours
  • During peak hours, buses run through to Plattling

 

RE 50

Usual routeNuremberg – Feucht – Neumarkt (Oberpf.) – Regensburg –Plattling
ChangesRE 50 between Regensburg and Passau will not run. There will be a replacement bus service.
Information about the replacement service for Regensburg – Passau
  • Single buses with toilets
  • 1 to 2 buses per hour Regensburg – Plattling
  • 1 to 2 buses per hour Regensburg – Passau
  • Highway route between Regensburg and Straubing as well as between Plattling and Passau, therefore only seating is available on these sections

 

RB 32

Usual route Neufahrn (Niederb.) – Geiselhöring – Straubing – Bogen
ChangesRB 32 will not run between Geiselhöring and Bogen. There will be a replacement bus service.
Information about the replacement services                                 
  • Buses without on-board toilets
  • 1 bus per hour
  • School bus trips with articulated buses to the schools
  • 2 to 3 buses per hour during the Gäubodenvolksfest
  • Travel time Geiselhöring – Straubing: 25 min
  • Travel time Straubing – Bogen: 35 min
  • Travel time Regensburg – Bogen (school transport): 50 min
  • Travel time Straubing Ursulinen-Gymnasium – Bogen (school transport): 20 min

 

RE 3

Usual routeMunich Hbf – Freising – Landshut – Plattling – Passau
ChangesRE 3 between Wallersdorf and Passau will not run. There will be a replacement bus service.
Information about the replacement services                                                                       
  • Buses with on-board toilets
  • 2 buses per hour
  • 3 buses per hour during peak hours
  • Travel time Plattling – Passau 1 hr 5 min 
  • In Wallersdorf and Landau there is a connection to the RE 3 to Munich.

 

RB 3

HintAdditional bus connection between Passau and Plattling with stops along the route.
Information about the replacement service
  • Articulated buses
  • Stops at Osterhofen Industriestraße and Stadtplatz, as well as Vilshofen station
  • 2 to 3 buses per hour
  • Travel time Plattling – Passau: 1 hour 5 minutes
  • Connection in Plattling to RE 3 to and from Munich

 

RB 54

Usual routeKufstein – Rosenheim – Munich Hbf
ChangesThere are changes in the schedule. The reason for this is the diversion of rail freight traffic.
Information about the replacement services                        
  • The frequency of RB 54 between Rosenheim and Munich Central Station will be reduced to 2 hours.
  • During the gaps in the schedule, i.e. offset by 2 hours from the train, replacement bus services will run between Grafing and Rosenheim.
  • During the hours when RE 54 is not running, RE 5 will make an additional stop in Grafing.
  • In Grafing, there is a connection to Munich Central Station.

 

Without replacement bus service

There will be changes in the schedule for the following lines. The reason for this is the diversion of rail freight traffic.

 

RE 1

Usual routeMunich Hbf – Ingolstadt Hbf – Nuremberg
Changes in the schedule
  • Mon–Fri: Between Munich Central Station and Ingolstadt Central Station, services run every 2 hours.
  • The operating lines S 2 and RB 16 provide at least partially alternative connections.

 

RB 40

Usual routeMunich Hbf – Munich Ost – Mühldorf (Inn)
Changes in the schedule
  • RB 40 between Munich Hbf und Munich Ost will not run.
  • The S-Bahn trains running through the core route provide alternative connections.

 

RB 45

Usual routeMühldorf (Inn) – Garching – Freilassing – Salzburg
Changes in the schedule
  • RB 45 between Freilassing and Salzburg will not run.
  • S 3 (ÖBB) as well as line RE 5 provide alternative connections on this route.

 

RB 48

Usual routeMunich Hbf – Grafing Bf – Wasserburg
Changes in the scheduleThe RB 48 only runs from Grafing Bahnhof. There is a connection to the RB 54 or the RE 5 (for details see RB 54).  

 

RB 13

Usual routeAugsburg Hbf – Friedberg – Ingolstadt Hbf
Changes in the schedule  The 15-minute interval between Augsburg Central Station and Friedberg is discontinued on weekdays (replaced by a 30-minute interval).  

 

RB 87

VerlaufDonauwörth – Meitingen – Augsburg Hbf – Munich Hbf
Changes in the schedule
  • The peak hour services between Augsburg and Donauwörth are canceled.
  • Additionally, Monday to Friday, the trains that only run between Augsburg and Meitingen are canceled. 
  • The hourly connections between Augsburg and Donauwörth will continue to operate.

 

RE 5

Usual routeSalzburg – Freilassing – Traunstein – Rosenheim – Munich
Changes in the schedule
  • Between Traunstein and Munich, the extra trains are canceled during rush hour.
  • Every 2 hours, offset from the RB 54 service, the train also stops at Grafing station.